i know i'm being bitchy by saying this.
but junda, i freaking hate you for getting the OM date wrong and convincing everyone it's correct and giving us 3 more weeks to do the impossible which includes ordering wheels from US which will take 7-10 days to fly over. sorry, but you're impossible.
and daryl, if you need someone to talk to i'm here.
OM timeline:
19-comfirm everything
-get comfirmation on kornylaks
-yes/no to alternatives in singapore
-alternative wood and where to get them
20-go down to simlim for recee
-get exact motors prepared and specs taken down.
-buy motors if can
-head down to zhai motor store to get the mounts
-get wires and 2 way switches(more the merrier)
-solder
-12v lead acid batteries
21-start sawing the wood and stuff
23-get the full base done
26-battries gotten
-motors working with switches in place
-2way drive enabled if possible
-do wiring diagraming
-motors attached on
30-full thing done
-other props should have been made and lines rehearsed.